LEED Commissioning - Administrative Building Rustonka A

Project assignment and objectives

Even with our small contribution, the project was awarded the LEED-Gold certification. Our own commissioning agent and team teamed on the project both before and after the supplier selection. The content of the commissioning was the preparation of all documents, commissioning of the plan, inspection and defect detection during construction. Fundamental / Enhanced Commissioning covered all HVAC, lighting, hot water and MaR systems.

Results

The project was successfully completed by obtaining a targeted LEED-GOLD certification.